Operating review

QUANTITIES OF REGASIFIED LNG PER USER

  Download XLS (16 kB)

(billions of m3)

2009

2010

2011

Change

Change %

Enel Trade

1.01

1.28

1.33

0.05

3.9

Eni

0.10

0.22

0.02

(0.20)

(90.9)

Other

0.21

0.48

0.54

0.06

12.5

 

1.32

1.98

1.89

(0.09)

(4.5)

In 2011 the LNG terminal in Panigaglia (SP) regasified 1.89 billion cubic metres of natural gas (compared with 1.98 billion cubic metres in 2010), unloading 50 tankers of various types, including one spot load (compared with 54 tankers in 2010, including three spot loads).

VOLUMES OF REGASIFIED LNG AND NUMBER OF LNG TANKER LOADS

Investments

Investments in 2011 totalled €3 million (the same as 2010) and mainly involved projects for maintaining plant system safety.

to pagetop

Chart Generator

Compare the key figures
of the past years.

Chart Generator more

Download centre

Download the Annual Report as PDF and XLS.

Download centre more

Snam’s presence in the territory

Infrastructure as
at 31 December 2011

Presence in the territory more
to pagetop