QUANTITIES OF REGASIFIED LNG PER USER
Download XLS (16 kB) |
(billions of m3) |
2009 |
2010 |
2011 |
Change |
Change % |
Enel Trade |
1.01 |
1.28 |
1.33 |
0.05 |
3.9 |
Eni |
0.10 |
0.22 |
0.02 |
(0.20) |
(90.9) |
Other |
0.21 |
0.48 |
0.54 |
0.06 |
12.5 |
|
1.32 |
1.98 |
1.89 |
(0.09) |
(4.5) |
In 2011 the LNG terminal in Panigaglia (SP) regasified 1.89 billion cubic metres of natural gas (compared with 1.98 billion cubic metres in 2010), unloading 50 tankers of various types, including one spot load (compared with 54 tankers in 2010, including three spot loads).
VOLUMES OF REGASIFIED LNG AND NUMBER OF LNG TANKER LOADS
Investments
Investments in 2011 totalled €3 million (the same as 2010) and mainly involved projects for maintaining plant system safety.