Header Background

Technical investments

 Download XLS (23 kB)

Third regulatory period

 

2013

Fourth regulatory period

 

2014

2015

Type of investment

Higher compen­sation in third regulatory period (%) (*)

€/
million

Type of investment

Higher compen­sation in fourth regulatory period (%) (**)

€/
million

€/
million

(*)

Compared with a real pre-tax WACC of 6.3%.

(**)

Compared with a real pre-tax WACC of 6.3% plus 1% to offset the regulatory lag.

Development of new import and export capacity

3.0%

277

Development of new import and export capacity

2.0%

303

249

Development of the national network

2.0%

3

Development of the national network

1.0%

 

 

Development of the regional network

2.0%

87

Development of the regional network

1.0%

67

79

Security and quality

1.0%

149

Replacement and other

 

330

365

Replacement and other

 

156

 

 

 

 

 

 

672

 

 

700

693

In 2015 technical investments totalled €693 million, which was essentially in line with 2014 (€700 million; -€7 million or 1.0%) and fully in line with investments projected for 2015 in the Business Plan for the four-year period 2015-2018.

Investments were classified in accordance with Resolution 514/2013/R/gas of the Authority, which identified various categories of projects with different rates of return.

The main investments for the development of new transportation capacity on the national network to bolster import and export capacity, for which a higher return of 2.0% (€249 million) is projected, concern the following:

  • in terms of building infrastructure in the area of the Po Valley plain to increase transportation capacity in the north-west of the country and for the reversal of physical transportation flows to enable physical exports from interconnection points with northern Europe (€176 million): (i) the continuation of construction works for the Zimella-Cervignano pipeline; (ii) the continuation of construction works for the Minerbio-Poggio Renatico pipeline; (iii) the delivery of materials and the continuation of construction works for upgrading the Poggio Renatico plant; (iv) the delivery of materials and the continuation of construction works relating to the new hub at Minerbio; (v) the delivery of materials for the Cervignano-Mortara pipeline; (vi) the continuation of construction works relating to the new hub at Sergnano; and (vii) the allocation of the order for turbo compressors relating to the new plants at Sergnano and Minerbio;
  • as part of the projects to upgrade the transportation network from the entry points in southern Italy (€63 million): (i) the continuation of construction works for the Biccari-Campochiaro pipeline, in Campania-Puglia-Molise; and (ii) the delivery of materials and the continuation of renovation works on the Enna plant in Sicily.

The main investments for the development of new transportation capacity on the regional network with a greater return of 1.0% (€79 million) relate to a numerous works to upgrade the network and to connect to new regional and national redelivery points, including:

  • the continuation of construction works relating to the upgrading of the Gavi-Pietralavezzara pipeline in Piedmont-Liguria (€25 million);
  • the continuation of the construction of pipelines and connections related to the initiative for the methane conversion of the Calabria region (€9 million).

Investments in replacements and other investments with a basic rate of return (€365 million) mainly concern works to maintain plant security and quality levels (€253 million); the purchase of other assets to support operational activities (€45 million), including real estate investments (€36 million) that incorporate the Green Data Centre (the complex where Snam’s entire IT infrastructure is located); projects for the development of new IT systems and for the implementation of existing systems (€42 million) and works with recourse to third parties (€18 million).

INVESTMENT PROPORTIONS BY TYPE OF RETURN (%)

Technical investments – Investment proportions by type of return (%) (Bar chart)

Progress of work to obtain permits

 Download XLS (23 kB)
EIA decrees obtained during the year

Name

Length
(km)

Regions affected

Authority

Date of decree

Upgrade of Raldon-Legnago pipeline: Isola della Scala-Cerea DN 250 (10”) – DP 75 bar; Spina di Cerea DN 250 (10”) – DP 12 bar; related connections and disposals.

29.50

Veneto

Province of Verona

05/03/2015

Recanati-Foligno pipeline: DN 1050 (42”) – DP 75 bar

113.03

Umbria; Marche

Ministry of the Environment and Protection of Land and Sea

06/03/2015

Agrigento-Piazza Armerina pipeline: DN 1200 (48”) – DP 75 bar

75.10

Sicily

Ministry of the Environment and Protection of Land and Sea

16/03/2015

Pontremoli-Cortemaggiore pipeline: DN 900 (36”) – DP 75 bar and related works.

130.73

Tuscany; Emilia – Romagna

Ministry of the Environment and Protection of Land and Sea

07/08/2015

Pipeline: Diversion to Manfredonia variant: DN 500 (20”) – DP 64 bar

2.30

Puglia

Province of Foggia

03/12/2015

 Download XLS (23 kB)
Orders received during the year to check EIA requirements

Name

Length
(km)

Regions affected

Authority

Date of decree

Pezzan-Lancenigo pipeline connection: DN 200 (8") – DP 24 bar; upgrade of Spina di Treviso Nord: DN 250 (10") – DP 12 bar and related works.

5.75

Veneto

Province of Treviso

23/03/2015

Pipeline connection Ital Gas Storage at Cornegliano Laudense: DN 1050 (42") – DP 75 Bar

9.80

Lombardy

Ministry of the Environment and Protection of Land and Sea

03/06/2015

Pipeline: Spina di Corato variant: DN 150 (6") – DP 75 bar

5.10

Puglia

Province of Bari

08/07/2015

Spina per Polignano a Mare pipeline: DN 150 (6") – DP 24 bar and related works.

2.29

Puglia

Province of Bari

12/11/2015

 Download XLS (22 kB)
EIA applications submitted to Ministry of the Environment and Ministry of Cultural Heritage and Activities

Name

Length
(km)

Regions affected

Date of decree

Pipeline – TAP interconnection: DN 1400 (56”) – DP 75 bar

55.09

Puglia

10/11/2015

 Download XLS (22 kB)
EIA applications submitted to regions or provinces

Name

Length
(km)

Regions affected

Date of decree

Pipeline: Diversion to Manfredonia variant: DN 500 (20”) – DP 64 bar

2.30

Puglia/Province of Foggia

31/03/2015

 Download XLS (23 kB)
Applications submitted to regions or provinces to check EIA requirements

Name

Length (km) Capacity (MW)

Authority

Date of decree

Cortemaggiore-Genoa pipeline: DN 400 (16”) – DP 12 bar and related works: variant in municipalities of Rottofreno, Calendasco and Piacenza.

11.90

Emilia-Romagna/Province of Piacenza

26/03/2015

Osio Sopra pressure reduction station

1.8 MW

Lombardy/Province of Bergamo

10/04/2015

Pipeline double connection of Agip Falconara wells at Ravenna-Chieti: DN 500 (20”) – DP 70 bar and pipeline connection of Agip Falconara wells at Ravenna-Chieti: DN 250 (10”) – DP 70 bar – variants for installation of traps and filters and related works.

0.75

Marche

01/07/2015

Pipeline downgrading Chieti-Rieti: DN 400 (16”) – DP 24 bar

14.66

Abruzzo; Lazio

20/07/2015