Operating review
During 2015, the Panigaglia (SP) LNG terminal regasified 0.03 billion cubic metres of natural gas, an increase of 0.02 billion cubic metres compared with 2014. The LNG regasification was carried out as part of the peak shaving service.
Download XLS (22 kB) |
|
2013 |
2014 |
2015 |
Active customers (shippers) |
3 |
3 |
4 |
Compliance with the maximum period of interruption/reduction in capacity at the terminal due to maintenance works (%) |
100 |
100 |
100 |
Organisational changes related to operational activitiesy
A total of 73 people were employed in the regasification sector as at 31 December 2015. During 2015, the number of employees fell by four, with two contracts being terminated and a net loss of two employees due to transfers within the Snam Group.
Accidents
Download XLS (22 kB) |
|
2013 |
2014 |
2015 |
Total accidents involving employees |
0 |
0 |
0 |
Total accidents involving contract workers |
0 |
1 |
0 |
Download XLS (23 kB) |
|
2013 |
2014 |
2015 |
||||
|
|||||||
Employees |
|
|
|
||||
Frequency index (*) |
0.00 |
0.00 |
0.00 |
||||
Severity index (**) |
0.00 |
0.00 |
0.00 |
||||
Contract workers |
|
|
|
||||
Frequency index (*) |
0.00 |
32.72 |
0.00 |
||||
Severity index (**) |
0.00 |
0.43 |
0.00 |
Energy consumption and emissions
Download XLS (23 kB) |
|
2013 |
2014 |
2015 |
||
|
|||||
Energy consumption (TJ) |
45 |
31 |
52 |
||
Emissions of CO2eq – Scope 1 (tonne) (*) |
53,654 |
32,169 |
38,659 |
||
Emissions of natural gas (106 m3) |
3.4 |
1.9 |
2.0 |
||
Emissions of NOx (tonne) |
1.1 |
0.3 |
1.1 |