Third regulatory period (January 2014 - December 2017)

 

2014

2015

2016

Type of investment

Higher compensation
in fourth regulatory period (%) (*)

€/million

€/million

€/million

(*)

Compared with the base WACC of 6.3% for 2014 and 2015 and 5.4% for 2016, in addition to 1% to offset the regulatory lag.

New import and/or export capacity

2.0%

303

249

226

New National Network transportation capacity

1.0%

 

 

1

New Regional Network transportation capacity

1.0%

67

79

118

Replacement and other

 

330

365

431

 

 

700

693

776

Technical investments in 2016 amounted to €776 million, an increase of €83 million, or 12.0%, compared with 2015 (€693 million).

Investments were classified in accordance with Resolution 514/2013/R/gas of the Electricity, Gas and Water Authority, which identified various categories of projects with different rates of return.

The main investments for the development of new transportation capacity on the National Network to bolster import and export capacity, for which a higher return of 2.0% (€226 million) is projected, concern the following:

  • as part of the initiative to support the market in the north-west of the country and to make it possible to reverse the physical transportation flows at the interconnection points with northern Europe (€181 million) in the Po Valley area: (i) completion of construction works on the connection points and additional work on the Zimella-Cervignano pipeline; (ii) completion of the main construction works to upgrade the Poggio Renatico plant; (iii) the continuation of activities relating to the supply of turbo compressors relating to the new Sergnano and Minerbio plants; and (iv) completion of the main construction works on the new Minerbio hub;
  • as part of the projects to upgrade the transportation network from the entry points in southern Italy (€40 million): (i) completion of the main construction works on the Biccari-Campochiaro pipeline in Campania, Puglia and Molise; and (ii) continuation of construction works on the Massafra-Biccari pipeline connection points.

The main investments for the development of new National Network (€1 million) and Regional Network (€118 million) transportation capacity, with an anticipated greater return of 1.0%, relate to a number of works to upgrade the network and to connect to new regional and national redelivery points, particularly: (i) the completion of construction works relating to the upgrade of the Gavi-Pietralavezzara pipeline in Piedmont and Liguria (€34 million); (ii) the continuation of the main construction works relating to the “Derivazione per Montebello Jonico e Melito di Porto Salvo” pipeline (€21 million); (iii) completion of the main construction works on the Lainate-Olgiate Olona pipeline and the continuation of such works on the Mornico al Serio-Travagliato pipeline, Mornico-Chiari section relating to the network upgrade in Lombardy (€12 million); and (iv) continuation of construction works on the pipelines and connections relating to the methane conversion initiative in the Calabria Region (€11 million).

Investments in replacement and other investments with a basic rate of return (€431 million) concern works aimed at maintaining security and quality levels at plants (€336 million), projects relating to the development of new information systems and the implementation of existing ones (€40 million) and metering (€19 million), works relating to compensation for third parties (€19 million) and the acquisition of other key operating assets (€17 million), including investments for the acquisition of vehicles (€9 million) and real estate investments (€5 million).

Investment proportions by type of return (%)

Investment proportions by type of return (Bar chart)
Progress of work to obtain permit
EIA decrees obtained during the year

Name

Length
(km)

Regions affected

Authority

Date of decree

Gas Pipeline – Puglia-Basilicata Transportation Network Upgrade

266.59

Puglia-Basilicata

Puglia Region

03/03/2016

Orders received during the year to check EIA requirements

Name

Length
(km)

Regions affected

Authority

Date of order

Gas Pipeline – S. Andrea Apostolo dello Ionio – Caulonia

51.70

Calabria

Calabria Region

25/02/2016

Gas Pipeline – Branch for Stilo and Bivongi

5.20

Calabria

Calabria Region

25/02/2016

Gas Pipeline – doubling and connection of Agip wells to Ravenna-Chieti pipeline: installation of traps and filters

0.6

Marche

Marche Region

22/04/2016

Applications submitted to the Ministry of the Environment to check EIA requirements

Name

Length
(km)

Regions affected

Submission date

Castrovillari-Melizzano Gas Pipeline: GAME A variant

3.10

Campania

07/07/2016

Applications submitted to regions or provinces to check EIA requirements

Name

Length (km)

Regions affected

Submission date

Corte-Genoa Gas Pipeline: Variants in Rottofreno municipality

5.28

Emilia-Romagna

31/05/2016

Gas Pipeline – Edison Garaguso and Masseria Monaco Connection

4.41

Basilicata

10/06/2016

Gas Pipeline – Pietravairano-Pignataro Maggiore Connection

25.10

Campania

24/08/2016

Benevento-Cisterna Gas Pipeline: Variants

3.38

Campania

30/08/2016

“Derivazione per Salerno” Gas Pipeline: Variant

2.08

Campania

31/08/2016

Mornico al Serio-Travagliato-Tratto Chiari-Travagliato Gas Pipeline

13.71

Lombardy

10/11/2016

to pagetop