Technical investments

 Download XLS (19 kB)
Technical investments

 

2016

2017

2018

Type of investment

Greater return (%) (*)

Million €

Greater return (%) (*)

Million €

Type of investment

Greater return (%) (**)

Million €

(*)

With respect to an actual pre-tax basic WACC of 5.4%. For 2016 only, the actual basic pre-tax WACC is plus 1% to offset the regulatory lag.

(**)

With respect to an actual basic pre-tax WACC of 5.4%, applied to investments in new transmission capacity and with a cost-benefits analysis of more than 1.5 in accordance with Resolution 575/2017/R/Gas.

Development of new import capacity

2.0%

226

2.0%

276

Development

1.0%

279

Development of the national network

1.0%

1

1.0%

10

 

 

 

Development of the regional network

1.0%

118

1.0%

97

 

 

 

Replacement and other

 

431

 

534

Replacement and other

 

485

 

 

776

 

917

 

 

764

Technical investments in 2018 amounted to 764 million euro, a decrease of 153 million euro, or 16.7%, compared with 2017 (917 million euro).

Investments have been classified consistently respectively with resolutions 575/2017/R/gas with reference to FY 2018 and 514/2013/R/gas for 2017 investments where by the Autorità di Regolazione per Energia, Reti e Ambiente (“ARERA” or the “Authority”) identified different categories of projects with which a different level of remuneration is associated.

The main investments made in developing new transmission capacity, for which a greater remuneration of 1% is envisaged (279 million euro), mainly concern:

  • investments in developing new transmission capacity on the national network functional to import and export capacity (174 million euro) as part of the initiative to support the market in the country’s north-west, and to allow for the reversal of physical transmission flows at the interconnection points with northern Europe in the area of the Po Valley, projects to upgrade the transmission network from the entry points in southern Italy, the Cervignano-Mortara methane pipeline and the compression plants of Sergnano and Minerbio, which were commissioned starting October 2018;
  • investments in developing new transmission capacity on the regional and national networks (106 million euro), including: (i) the continuation of works relating to the Cornegliano Laudense Italgas Storage S.r.l. connection; (ii) the continuation of construction works and connections relating to the methanisation of the region of Calabria, including the Montebello Jonico derivation.

Investments in replacement and other investments with basic remuneration11 (485 million euro) mainly concern: (i) works aimed at maintaining plant safety levels, also in terms of function and quality (366 million euro) including the continuation of works for the design and acquisition of permits and start to delivery of materials for the rebuilding of the Ravenna-Chieti methane pipeline, stretch Ravenna-Recanati (27 million euro); (ii) projects relating to the development of new information systems, as well as the implementation of the existing ones (65 million euro); (iii) upgrading projects for the redelivery plants (24 million euro); (iv) reclamation works for third parties (10 million euro); and (v) the purchase of assets instrumental to operating activities (18 million euro).

Progress of work to obtain permits

For the development of new sites, in addition to the technical-economic feasibility criteria, Snam adopts procedures that meet strict environmental compatibility and safety assessments.

The assessments of the environmental effects involve all the phases of the work life cycle, site selection, planning, construction, operation and decommissioning. These assessments are made within the purview of the Environmental Impact Assessment (EIA) procedures, and in the Integrated Environmental Authorisation (IAEA) procedures, at the end of which the central and local administrations issue the permits required under current law.

 Download XLS (17 kB)
EIA decrees obtained during the year

Name

Length (km)

Regions involved

Competent agencies

Date of decree

Pipelines

 

 

 

 

Redoing of the Rimini-Sansepolcro methane pipeline and related works

81.915

Emilia-Romagna and Tuscany

Tuscany

18/06/18

 Download XLS (17 kB)
Integrated Environmental Authorisation (IEA) Decrees obtained during the year

Name

No. compression units

Regions involved

Competent agencies

Date of decree

Gas compression plant

 

 

 

 

Gallese (review for substantial change)

3

Lazio

Ministry of the Environment and Protection of Land and Sea

11/05/2018

 Download XLS (17 kB)
Provisions for verification of whether subject to EIA obtained during the year

Name

Length (km)

Regions involved

Competent agencies

Date of provision

Pipelines

 

 

 

 

Mornico al Serio - Travagliato Tratto Chiari - Travagliato

24.94

Lombardy

Province of Brescia

03/05/2018

Asti-Cuneo Variants for the development of PIG receipt/launch plants

3.941

Piedmont

Ministry for the Environment

26/09/2018

 Download XLS (17 kB)
EIA applications submitted to Ministry of the Environment and Ministry of Cultural Heritage

Name

Length (km)

Regions involved

Date of submission

Pipelines

 

 

 

Redoing Ravenna - Chieti Tratto Ravenna - Jesi

142.6

Emilia-Romagna - Marche

30/04/2018

 Download XLS (18 kB)
Applications submitted to the Ministry of the Environment to check EIA requirements

Name

Length (km)

Regions –
Provinces involved

Date of submission

Pipelines

 

 

 

Re-connection of Torino di Sangro (CH)

1.132

Abruzzo

22/06/2018

Variant for the inclusion of PIDI no. 18.2 on Chieti - San Salvo (CH)

0.113

Abruzzo

22/06/2018

Tortona - Alessandria - Asti - Turin redoing Attr. FR 39.1

3.68

Piedmont

26/07/2018

Variants S. Eufemia - Crotone Ref. Crossing of River S.Anna (KR)

0.64

Calabria

01/08/2018

Derivation for Altino 2nd section real variant Hydraulic works on the river Rio Secco

0.07

Abruzzo

21/12/2018

Asti-Cuneo Variants for the development of PIG receipt/launch plants

3.941

Piedmont

28/03/2018

Plants

 

 

 

Plant HPRS IS64/24 bar of Castellana Grotte

 

Apulia

17/07/2018

 Download XLS (17 kB)
Applications for Integrated Environmental Authorisation (IEA) review submitted to the Ministry of the Environment

Name

No. compression units

Regions –
Provinces involved

Date of submission

Gas compression plants

 

 

 

Melizzano (review)

4

Campania-Benevento

24/12/2018

Montesano sulla Marcellana (review)

4

Campania-Salerno

24/12/2018

Tarsia (review)

4

Calabria-Cosenza

24/12/2018

Istrana (review, renewal and substantial change)

4

Veneto-Treviso

27/11/2018

11 For the investments of 2018, the basic rate of return includes the rate of return on net invested capital (real pre-tax WACC) of 5.4%.